Consumer unit upgrades (RCBOs, SPDs, tails)
Model the board as line items: isolation, testing and certification, notification where applicable, new devices, labelling, and realistic time for existing installation quirks — not a flat “new fuse box” figure that collapses when you open the enclosure.
Lighting installs — circuits, drivers, and accessories
Split decorative circuits from functional lighting, allow for downlight quantities and fire-rated fittings, and capture driver or control gear where LED loads need it. Customers see why your total differs from a hand-written one-liner.
Electrical labour pricing — half-days, fault find, out-of-hours
Use structured labour lines for first and second fix, fault diagnosis blocks, and premium rates for evenings or tight access — so short jobs still recover van time and the cognitive load of tracing faults.
Material examples merchants actually recognise
Cable by length and size, metal/plastic containment, accessories packs, and sundries that usually vanish from mental maths. Mark up contractor-supplied materials consistently so copper inflation does not quietly eat the job.